Bakewell Bridge 12

Bakewell Bridge Replacement 12 [Nov 2006]
oversize  Trailer for the large "James" beam lifting crane, in East Terrace. Monday 13 November 2006. east-a  View of the bridge spans above East Terrace. Monday 13 November 2006. beam01  Crane ready to lift a beam from the span over the interstate rail line once the mechanical jaws have severed it from the support columns. Monday 13 November 2006. beam02  Crane ready to lift a beam from the span over the interstate rail line once the mechanical jaws have severed it from the support columns. Monday 13 November 2006.
beam03  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam04  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam05  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam06  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006.
beam07  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam08  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam09  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam10  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006.
beam11  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam12  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam13  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. beam14  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006.
beam15  Crane lifting a beam from the span over the interstate rail line. Monday 13 November 2006. east-b  Loader working on the rubble from the "high vehicle" bridge span above East Terrace. Monday 13 November 2006. east-c  Loader working on the rubble from the "high vehicle" bridge span above East Terrace. Monday 13 November 2006. pier1  The concrete pier installed to replace columns destroyed in a derailment in 1995, following removal of bridge beams. Thursday 16 November 2006.
loader1  Loader at work by the remaining spans over East Terrace. Thursday 16 November 2006. pier2  The concrete pier installed to replace columns destroyed in a derailment in 1995, following removal of bridge beams. Thursday 16 November 2006. pier3  The concrete pier installed to replace columns destroyed in a derailment in 1995, following removal of bridge beams. Seen from Glover Avenue side. Thursday 16 November 2006. glover01  Removing soil and rubble from the Glover Avenue approach. Thursday 16 November 2006.
glover02  Removing soil and rubble from the Glover Avenue approach. Thursday 16 November 2006. glover03  Removing soil and rubble from the Glover Avenue approach. Thursday 16 November 2006. glover04  Removing soil and rubble from the Glover Avenue approach. Thursday 16 November 2006. glover05  Removing soil and rubble from the Glover Avenue approach. Thursday 16 November 2006.
glover06  Removing soil and rubble from the Glover Avenue approach. Thursday 16 November 2006. glover07  Removing soil and rubble from the Glover Avenue approach. Thursday 16 November 2006. loaders1  Small and large loaders working on the interstate rail line. Thursday 16 November 2006. loaders2  Small and large loaders working on the interstate rail line. Thursday 16 November 2006.
loaders3  Small and large loaders working on the interstate rail line. Thursday 16 November 2006. piling1  Pile drilling rig at work on the Glover Avenue end. Thursday 16 November 2006. piling2  Pile drilling rig at work on the Glover Avenue end. Thursday 16 November 2006. west01  Komatsu loader on the western approach from Henley Beach Road. Friday 17 November 2006.
west02  Hitachi loader on the western approach from Henley Beach Road. Friday 17 November 2006. west03  Scissor lift under the stairs near East Terrace. Friday 17 November 2006. west04  Komatsu and Hitachi loaders on the western approach from Henley Beach Road. Friday 17 November 2006. crane1  Crane in East Terrace, near the interstate rail line. Friday 17 November 2006.
pier4  The concrete pier installed to replace columns destroyed in a derailment in 1995, following removal of bridge beams. Friday 17 November 2006. chisel01  Mini excavator about to break up concrete sections between the rail lines. Friday 17 November 2006. chisel02  Mini excavator about to break up concrete sections between the rail lines. Friday 17 November 2006. chisel03  Mini excavator about to break up concrete sections between the rail lines. Friday 17 November 2006.
pier5  The concrete pier installed to replace columns destroyed in a derailment in 1995, following removal of bridge beams. Friday 17 November 2006. east-d  View of the bridge span above East Terrace near the interstate rail line. Friday 17 November 2006. cleaner1  I suspect this is a truck mounted vacuum cleaner, near the interstate rail line. Friday 17 November 2006. crane2  Crane lifting mesh near the interstate rail line. Friday 17 November 2006.
water1  Water truck on the Glover Avenue end. Friday 17 November 2006. piling3  Pile drilling rig at work on the Glover Avenue end. Friday 17 November 2006. tipper1  Tip truck and trailer delivering soil to East Terrace. Friday 17 November 2006. tipper2  Tip truck and trailer delivering soil to East Terrace. Friday 17 November 2006.
tipper3  Tip truck and trailer delivering soil to East Terrace. Friday 17 November 2006. congdon1  View north along James Congdon Drive to the Bakewell Bridge over East Terrace. Friday 17 November 2006. hbr1  Concrete from the demolished approach to the bridge in Henley Beach Road. Wednesday 22 November 2006. path1  Workers paving the footpath near the interstate rail line, ready for diversion of East Terrace to allow demolition of remaining spans. Wednesday 22 November 2006.
path2  Workers paving the footpath near the interstate rail line, ready for diversion of East Terrace to allow demolition of remaining spans. Wednesday 22 November 2006. east-1  Intact spans above East Terrace. Wednesday 22 November 2006. east-2  Intact spans above East Terrace. Wednesday 22 November 2006. east-3  Exposed beams on the spans above East Terrace, which is about to be diverted to allow the remaining spans to be demolished. Wednesday 22 November 2006.
caution1  Caution sign and chain on the access path across the rail lines, just north of the bridge. Wednesday 22 November 2006. pile01  Crane raising steel reinforcing to place it into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006. pile02  Crane raising steel reinforcing to place it into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006. pile03  Crane raising steel reinforcing to place it into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006.
pile04  Crane lowering steel reinforcing into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006. pile05  Crane lowering steel reinforcing into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006. pile06  Crane lowering steel reinforcing into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006. pile07  Crane lowering steel reinforcing into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006.
pile08  Crane lowering steel reinforcing into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006. pile09  Crane lowering steel reinforcing into a hole drilled for a pile near the interstate rail line. Wednesday 22 November 2006. funnel1  Crane lowering a funnel by a hole drilled for a pile near the interstate rail line, ready for concrete pour. Wednesday 22 November 2006. funnel2  Crane lowering a funnel by a hole drilled for a pile near the interstate rail line, ready for concrete pour. Wednesday 22 November 2006.
funnel3  Crane lowering a funnel by a hole drilled for a pile near the interstate rail line, ready for concrete pour. Wednesday 22 November 2006. funnel4  Crane lowering a funnel by a hole drilled for a pile near the interstate rail line, ready for concrete pour. Wednesday 22 November 2006. funnel5  Crane lowering a funnel by a hole drilled for a pile near the interstate rail line, ready for concrete pour. Wednesday 22 November 2006.