Bakewell Bridge 10

Bakewell Bridge Replacement 10 [Nov 2006]
pile01  Pile drilling rig prepares to move to drill another hole. Monday 6 November 2006. pile02  Pile drilling rig prepares to move to drill another hole. Monday 6 November 2006. pile03  Pile drilling rig prepares to move to drill another hole. Monday 6 November 2006. pile04  Pile drilling rig moves to drill another hole. Monday 6 November 2006.
pile05  Pile drilling rig moves to drill another hole, as railcar 3027 passes on the Brighton line. Monday 6 November 2006. pile06  Pile drilling rig moves to drill another hole, as railcar 3027 passes on the Brighton line. Monday 6 November 2006. pile07  Pile drilling rig prepares to drill another hole, as railcars pass and the water cart settles dust. Monday 6 November 2006. pile08  Pile drilling rig prepares to drill another hole, as the crane on the bridge prepares to lift shield panels into position. Monday 6 November 2006.
shield01  Crane on the bridge lifts a shield panel into position by the suburban rail lines. Monday 6 November 2006. shield02  Crane on the bridge lifts a shield panel into position by the suburban rail lines. Monday 6 November 2006. shield03  Crane on the bridge lifts a shield panel into position by the suburban rail lines. Monday 6 November 2006. shield04  Crane on the bridge lifts a shield panel into position by the suburban rail lines. Monday 6 November 2006.
shield05  Crane on the bridge lifts a shield panel into position by the suburban rail lines. Monday 6 November 2006. west1  Deck and piers of the western approach from Henley Beach Road being partially demolished and removed. Tuesday 7 November 2006. west2  Deck and piers of the western approach from Henley Beach Road being partially demolished and removed. Tuesday 7 November 2006. west3  Deck and piers of the western approach from Henley Beach Road being partially demolished and removed. Tuesday 7 November 2006.
west4  Deck and piers of the western approach from Henley Beach Road being partially demolished and removed. Tuesday 7 November 2006. loader1  Loader with large scoop used to catch falling debris from bridge during demolition above the rail lines. Tuesday 7 November 2006. pile09  Crane lowering steel reinforcing into a hole drilled for an underpass pile on the Glover Avenue side. Tuesday 7 November 2006. tip1  Tip truck ready to cart rubble from a pile near the interstate rail line. Tuesday 7 November 2006.
loader2  Loader with large scoop used to catch falling debris from bridge during demolition above the rail lines. Tuesday 7 November 2006. pile10  Crane lowering steel reinforcing into a hole drilled for an underpass pile on the Glover Avenue side. Tuesday 7 November 2006. tip2  Loading tip truck  with rubble from a pile near the interstate rail line. Tuesday 7 November 2006. tip3  Loading tip truck  with rubble from a pile near the interstate rail line. Tuesday 7 November 2006.
tip4  Loading tip truck  with rubble from a pile near the interstate rail line. Tuesday 7 November 2006. tip5  Loading tip truck  with rubble from a pile near the interstate rail line. Tuesday 7 November 2006. tip6  Loading tip truck  with rubble from a pile near the interstate rail line. Tuesday 7 November 2006. pile11  Crane lowering steel reinforcing into a hole drilled for an underpass pile on the Glover Avenue side. Tuesday 7 November 2006.
piling1  Pile drilling rig in the compound on the Glover Avenue side. Tuesday 7 November 2006. piling2  Pile drilling rig in the compound on the Glover Avenue side. Tuesday 7 November 2006. piling3  Pile contractor's vehicle and crane on the Glover Avenue side. Tuesday 7 November 2006. ready1  Readymix concrete arriving, to be poured into the bored and reinforced pile hole. Tuesday 7 November 2006.
ready2  Readymix concrete arriving, to be poured into the bored and reinforced pile hole. Tuesday 7 November 2006. ready3  Readymix concrete arriving, to be poured into the bored and reinforced pile hole. Tuesday 7 November 2006. ready5  Readymix concrete being poured into the bored and reinforced pile hole. Tuesday 7 November 2006. ready4  Readymix concrete being poured into the bored and reinforced pile hole. Tuesday 7 November 2006.
west5  Western approach from Henley Beach Road being partially demolished and removed. Thursday 9 November 2006. west6  Western approach from Henley Beach Road being partially demolished and removed. Thursday 9 November 2006. west7  Western approach from Henley Beach Road being partially demolished and removed. Thursday 9 November 2006. boom1  Unloading a telescopic boom in East Terrace. Thursday 9 November 2006.
boom2  Unloading a telescopic boom in East Terrace. Thursday 9 November 2006. boom3  Unloading a telescopic boom in East Terrace. Thursday 9 November 2006. boom4  Unloading a telescopic boom in East Terrace. Thursday 9 November 2006. freight1  Remains of the span above the freight rail lines, with daylight showing where the deck has been removed. The protest sign for the northern footpath can be partly seen on the parapet. Thursday 9 November 2006.
trucks1  Contractors' trucks near the Mile End pedestrian subway. Transfield truck in front is equipped for railway use. Thursday 9 November 2006. trucks2  Contractors' trucks near the Mile End pedestrian subway. Transfield truck in front is equipped for railway use. Thursday 9 November 2006. freight2  Remains of the span above the freight rail lines, with daylight showing where the deck has been removed. The protest sign for the northern footpath can still be seen on the parapet. Thursday 9 November 2006. trucks3  Contractors' trucks near the Mile End pedestrian subway. Transfield truck in front is equipped for railway use. Thursday 9 November 2006.
komatsu1  Komatsu loader at rest between the suburban and interstate rail lines. Thursday 9 November 2006. moving1  Earthmoving from the underpass in Glover Avenue. Thursday 9 November 2006. moving2  Earthmoving from the underpass in Glover Avenue. Thursday 9 November 2006. moving3  Earthmoving from the underpass in Glover Avenue. Thursday 9 November 2006.
moving4  Earthmoving from the underpass in Glover Avenue. Thursday 9 November 2006. moving5  Earthmoving from the underpass in Glover Avenue. Thursday 9 November 2006. cart  Filling the water cart by Glover Avenue. Thursday 9 November 2006. glover1  Water cart and earth moving in Glover Avenue. Thursday 9 November 2006.
glover2  Water cart settling the dust in Glover Avenue. Thursday 9 November 2006. glover3  Bobcat spreading earth on the mounds in Glover Avenue. Thursday 9 November 2006. span01  Span over the interstate rail line, showing the non-standard column construction. Friday 10 November 2006. span02  Span over the interstate rail line, showing the non-standard column construction, and the protective mesh shields. Friday 10 November 2006.
span03  Span over the interstate rail line, showing the non-standard column construction, and the protective mesh shields. Friday 10 November 2006. pole01  Crane about to lower a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006. pole02  Crane about to lower a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006. pole03  Crane lowering a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006.
pole04  Crane lowering a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006. pole05  Crane lowering a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006. pole06  Crane lowering a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006. pole07  Crane lowering a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006.
pole08  Crane lowering a streetlight pole in East Terrace, to allow demolition of the adjacent spans to proceed. Friday 10 November 2006. loader3  Loader with large scoop used to catch falling debris from bridge during demolition above the rail lines, in East Terrace. Friday 10 November 2006. pole09  Workers securing the lowered light pole to the site fence, to allow demolition of the adjacent  spans to proceed. Friday 10 November 2006. span04  Loader with mechanical jaws removing the bridge decking from the spans above East Terrace. Friday 10 November 2006.
span05  Loader with mechanical jaws removing the bridge decking from the spans above East Terrace. Friday 10 November 2006. span06  Loader with mechanical jaws removing the bridge decking from the spans above East Terrace. Friday 10 November 2006. span07  Loader with mechanical jaws removing the bridge decking from the spans above East Terrace. Friday 10 November 2006.